The Facility
Wing Point Golf & Country Club - Bainbridge Island, Washington
The Product
Fiberbuilt Grass Series Ultimate Tee Line
The Configuration
Three lines: One 63'x6' line and two 32'x4' lines
The Install Date
Line 1: June 2020 (32’ x 4), Line 2: March 2021 (63’ x 6’), Line 3: April 2022 (32’ x 4’)
The Motivation
The membership at this beautiful club on Bainbridge Island wanted a continuous tee line that matched the aesthetics of the surroundings. They loved the Fiberbuilt premium golf mats that had been previously installed thanks to the extreme durability of their Fiberbuilt Grass hitting surfaces, necessary since the regular rains forced them to be on mats most of the time. Installing Fiberbuilt Grass Ultimate Tee Lines allowed them to keep using this fantastic hitting surface, now in continuous tee line configurations. The result was both great looks for the club and ultra long-lasting practice surfaces.
The Impact
Fiberbuilt has been flexible, understanding & incredible to work with. Not only is it durable, it is very easy to install and professional looking when you're looking for a real grass alternative. They have fulfilled all our needs promptly and with a smile through the phone! Especially Teresa Logreco! She has been a pleasure to work with!For expert guidance on designing the right practice environment for your facility, call our design consultants at (833) 328-3218 or send us an email.Austin Hurt, PGA
Head Golf Professional
Wing Point Golf & Country Club